Sheet 02
The register
Pull dated 2026-08-23
Security Cameras and Floodlights on the Eave Come First
Cameras, floodlights and their wiring sit on the eave, so settle who unmounts them and reroutes the cable before the crew starts.
Most St. Charles roof jobs get planned around the shingles, the flashing and the dumpster. The eave is where the rest of the house is hung, and on many houses in town that includes a security camera on a soffit bracket, a doorbell camera beside the front door, and one or two floodlights screwed into the fascia over the garage. None of those are roofing items. All of them sit in the path of a tear-off, and a crew working at the edge of the roof will move, bend or cut the wire that feeds them unless someone has planned for it.
Town roofing
Walk the outside of the house before the roofers arrive and list every device that touches the roofline. Look at the fascia board, the soffit panels, the corners where the gutter meets the wall, and the gable ends above the second floor. Count cameras, motion lights, outdoor speakers and any holiday clip rail. In older St. Charles houses the wire for these often runs up through a soffit panel into the attic, and the cable is stapled along the underside of the rafter tails. When the crew pulls the old fascia, that path disappears.
Two kinds of wire matter. Low-voltage camera cable and doorbell wiring carry little power and usually get rerouted without much fuss. Line-voltage floodlights run on household current, and their supply is a different matter. Rewiring a line-voltage fixture is electrical work. It may need an electrician and, depending on the scope, a permit from the city or county. Ask whether each light runs from a switch inside the house or from a timer on the exterior, because that tells you where the supply comes from and who will have to touch it.
Where the mounts go, and why it matters
A camera bracket screwed into a soffit panel is usually anchored to a nailer or a rafter tail. When the soffit comes off, the bracket and its fasteners come off with it, and the roofer may pull out the nailer if it is in the way. Floodlights on the fascia are the same story. If the fascia is replaced, the light box has to come off the old board first and go back on the new one, with the wire fed through a fresh opening.
Freeze and thaw cycles in St. Louis make this harder than it looks. A mount that has held for years has often been sealed with caulk that has gone brittle. Pulling it in February can crack the paint on the soffit and open a path for water into the wall. Holes drilled in cold weather tend to be larger than planned because the material chips. If a mount has to move, the new hole needs exterior-rated sealant, and it should be checked after the first hard rain.
Doorbell cameras on a brick wall beside the door usually do not touch the roof at all. They can be ignored unless the crew needs to stand a ladder on that side. Check where the ladder will land, because a ladder set against a porch roof can knock a sensor off a wall or snag a cable that runs down the siding.
What it costs
Moving a camera or doorbell is a small item. The job is a few minutes of disconnecting, a length of cable, a new bracket and a short visit from the technician, and it usually does not show up as a roofing charge at all. The cost is in the scheduling. If the security company or the electrician has to come out twice, the second trip is the one that delays the crew. Get the date for the electrical visit in writing next to the roofing start date.
A floodlight that needs a new circuit or a relocated box costs more, and the price depends on the distance to the panel and whether a permit is required. No single figure fits every house. Treat the electrician's quote as a separate document, not a number to fold into the roof. A roofing proposal that says "electrical by others" without naming the person, the date and the scope leaves a gap that will show up on the day the ladder goes up.
What to ask
Ask the roofer three questions in writing. First, which of the devices on the eave will be removed, which will stay in place, and which will be taken off and reinstalled. Second, who disconnects the power and cable on each item, and whether the homeowner or the roofer is responsible for that step. Third, what happens to the cable that runs through the attic if the soffit is cut open, and who checks the wire once the new soffit is up.
Then ask for photographs. Before any panel comes down, the eave should be photographed with each device visible and each wire route marked. A written scope should list each camera, floodlight and sound device by location and say whether it is coming off. Keep those photos with the proposal. If the camera company later says the cable was damaged, the photos show what was there before the crew arrived.
Ask whether the crew will work around the devices or remove them, and get that decision in writing. A crew that plans to lift a camera bracket to reach the fascia needs the homeowner's permission to do it, and it is better to settle that in the proposal than on the ladder.
The part the roofer will not handle
Keep the roofing contract and the electrical and security work separate in your mind, even if one company is doing more than one of them. Missouri does not license roofers, and a roofing scope does not cover the wiring of a security system or the circuit that feeds a floodlight. If a device stops working after the job, the question of whose work caused it gets answered by the records. The photos, the dates and the written scope are what settle it.
A practical step: write a one-page list of every device on the eave with its brand, its power source and the name of the company that installed it. Put the account login or the installer's phone number on the same sheet. When the roofer asks what is on the eave, the list answers in a minute, and the homeowner is not searching a drawer on the morning of the tear-off. Call (314) 220-2333 if you want the roofing side of the eave walked with you before the schedule is set.
Next sheet
Where the county's roofers are registeredOne road carries six of them. Eleven are registered at what look like homes.