Sheet 02
The register
Pull dated 2026-08-23
Rock Beds at Your Eave Need Covering Before Tear-Off
Gravel and river rock under the eave collect tear-off debris and can hide nails, so settle who covers and rakes the bed before the crew arrives.
If your house has a river rock bed, a pea gravel strip, or a stone border running along the eave, the tear-off will reach it. A tear-off on a typical St. Charles County house takes a day or two, and every nail, granule, and torn piece of felt that comes off the roof has to land somewhere. Some of it falls on the lawn and some on the driveway, but a good deal of it drops straight into whatever sits under the gutter line. Rock is hard to rake and easy to misjudge, so a bed that nobody planned for usually ends up with roofing debris stirred into it.
What lands in the rock
The steepest part of the old shingle fall is the eave, where the crew pries the old courses loose and drops them over the edge. Granules from the old surface work into the gravel within a few days, and they are what makes a bed look dirty for the rest of the season. Nails are the bigger concern. Pea gravel and river rock are small enough that a nail can sink out of sight, and a bed raked once will still hide a few. A magnetic sweep picks up steel nails well, but it does nothing for the granules, so the cleanup has to be planned as two separate jobs.
Old shingles are also heavy in bulk. A bundle of tear-off material piled against a rock border can push stones out of their edging, and that is hard to fix once the crew has gone home. If the bed sits against a brick or stone border, ask where the debris pile will be staged so the border does not take the weight.
Where the new drip edge meets the bed
The drip edge is a metal flange that sits at the eave. It tucks under the underlayment at the rake and goes over the fascia at the eave, and it has to seat flat against the fascia board. A rock bed packed tight against the wall can keep the new metal from seating properly, and wet rock held against a fascia board can hold moisture against the wood for a long time. Before the work starts, find out whether the bed sits up against the fascia or leaves a gap, and whether the crew will need to move any rock to set the drip edge and the gutter hangers.
If the answer is yes, the rock should come out in a controlled way. It should be bagged or set on a tarp, kept separate from the soil underneath, and returned after the new metal is in place. Rock that is shoveled back over a newly installed drip edge can bury the lower edge of the metal and trap water behind it. Ask the crew to describe how the rock will be removed and returned, in writing if possible, before anyone takes the first shovel to the bed.
Ladders on pavers and mulch
St. Charles winters swing above and below freezing many times between December and March, and that cycle moves ground that was not built for it. Pavers set on a thin sand bed can heave or settle unevenly after a few seasons, and a stone walk near a downspout often has a low spot that holds water. When a ladder is set on a paver walk or a soft mulch bed, the load from the ladder and the worker can crack a unit or tip a stone. Old brick edging can crack under the same load, and the crack may not show until the first hard rain.
Ask where each ladder will be set. A reasonable answer names a spot on firm ground and mentions boards or plywood under the feet where the ladder meets mulch or a paver edge. If the proposal says only that the crew will work from ladders, the question is still open. A written answer on ladder placement is the one that matters when a paver cracks in April and someone has to say when it happened.
Downspouts that dump onto rock
If a downspout empties onto a rock bed during the tear-off, the new roof will not change where the water goes, but the old roof may have been directing it onto a spot that is now bare. Splash from a downspout over a few seasons will wash gravel out of the bed and leave a trench that catches more water. Before the work starts, note which downspouts discharge onto rock, and ask whether the crew will reconnect or extend them after the new gutters or downspout elbows go on. A downspout that empties onto a flat splash block is a different job from one that empties onto loose stone.
What to ask before the crew arrives
Most of these questions can be answered in a single sentence, and each answer should appear in the proposal or the written scope. Ask them before the start date is set.
- Which rock beds, borders, and walks will the tear-off debris reach, and how will they be covered?
- Will the crew use a magnetic sweep on the nails, and will the granules be raked out before the job is called finished?
- Will any rock be moved for the drip edge or the gutter hangers, and where will it be stored?
- Where will each ladder be set, and will boards or plywood go under the feet on mulch or pavers?
- Who walks the bed for missed nails after the final cleanup, and when?
- Which downspouts discharge onto rock, and will any of them be reconnected or extended?
Take dated photos of every bed, border, and walk on the property before the crew arrives. A phone photo with a visible date is enough. Include the edges where the rock meets the wall and the places where the downspouts land. If anything cracks or shifts during the job, those photos are the record of what the bed looked like before anyone set a ladder on it.
Keys Roofing can put these answers in writing as part of the scope, with photos and measurements, so the homeowner has them before the first shingle comes off. If the proposal you have does not address the rock, the bed, or the ladder spots, call Keys at (314) 220-2333 and ask for those lines to be added before you sign.
Next sheet
Where the county's roofers are registeredOne road carries six of them. Eleven are registered at what look like homes.